Welcome To LanHi, We Are Professional & Established Company.

Email

bertha@lanhi.com.cn

WhatsApp

+8618148135690

en EN

Intelligent Arch-Anchor Integrated Jumbo: An Efficient Solution for Modern Tunnel Construction

2025-09-29 Visits:

   Lanhi's Intelligent Arch-Anchor Integrated Jumbo is an advanced device utilizing an engineering chassis. Equipped with a dual anchor system, it features four-wheel steering, four-wheel drive, and bidirectional driving. Equipped with a diesel-electric dual-power system, it can operate in both electric and diesel emergency modes. Its three-arm remote control system excels in various tunnel construction scenarios, making it particularly suitable for prefabricated arch installation and various benching methods.

   The Intelligent Arch-Anchor Integrated Jumbo integrates multiple construction processes, including surveying and setting out points, undercutting, arch installation, anchor net installation, advanced support, system anchor bolting, and optional anchor grouting. Its three-arm, three-grip hanging basket structure enables a maximum lifting capacity of 3 tons at the middle boom, enabling all erection steps to be completed within one hour.

1-240531094U6316.jpg
   Utilizing Lanhi's patented technology, this device offers two installation methods: multiple prefabricated arches and multiple prefabricated folding arches. These arches are fabricated outside the tunnel, effectively reducing hazardous work time and construction risks, significantly improving construction efficiency. The equipment boasts a maximum drilling depth of 4.5 meters, and both booms can simultaneously perform foot locking, system anchoring, and advance anchoring operations, further enhancing construction flexibility and efficiency.

   In addition, the intelligent arch-anchor integrated trolley is equipped with an expandable hanging basket, providing greater operating space for loading explosives and anchors. An optional grouting system allows for rapid grouting after anchoring. The entire system can be operated by just three to four people, while traditional methods typically require more than eight.

   The equipment also includes a built-in breaker and welder, enabling undercutting and welding during arch installation. Its intelligent design includes cluster management, positioning, video monitoring, intercom, early warning/alarm functions, data management, tunnel BIM technology and digital twins, construction report management, tunnel profile scanning, and remote control. These integrated features significantly enhance construction safety, efficiency, and management, making the Lanhi intelligent arch-anchor integrated trolley an ideal choice for modern tunnel construction.

Leave Your Message

Leave a message

Can't see clearly? Click to change